Crush Guard - Installation - Genie ALC500/ALC1000 Finalisation

Crush Guard - Installation - Genie ALC500/ALC1000 Finalisation

Notes
This Tech Doc outlines the finalisation stages
Finalisation Steps:
1. Place the lid back onto the operator control box and tighten the 4 bolts that secure the lid. 


2. Connect the M23 connector from the control module to the socket installed in the operator control box.
3. Make sure that the connector is screwed up finger tight. 


4. Inspect the entire Crush Guard installation
5. Make sure that all bolts, connectors and cables are secure.
6. Make sure that the machine is fit for operation.