Crush Guard - Installation - Genie ALC500/ALC1000 Finalisation

Crush Guard - Installation - Genie ALC500/ALC1000 Finalisation

Notes
This Tech Doc outlines the finalisation stages
Finalisation Steps:
1. Place the lid back onto the operator control box and tighten the 4 bolts that secure the lid. 


2. Connect the M23 connector from the control module to the socket installed in the operator control box.
3. Make sure that the connector is screwed up finger tight. 


4. Inspect the entire Crush Guard installation
5. Make sure that all bolts, connectors and cables are secure.
6. Make sure that the machine is fit for operation.

    • Related Articles

    • Crush Guard - Installation - Genie Z-40/23N Finalisation

      This Tech Doc shows how to finalise the installation on the machine Installation Steps: 1. Place the lid back onto the operator control box and tighten the 4 bolts that secure the lid. 2. Connect the M23 connector from the Control Module to the ...
    • Crush Guard - Installation - Genie ALC1000 Wiring Connections

      This Tech Doc shows Crush Guard wiring connections on the ALC1000 Boom Lift Required hardware: 1000mm of two core cable minimum 18 gauge AWG 700mm of pink wire, minimum 18 gauge AWG 5 x red crimp joiner 1 x blue crimp joiner 1 x yellow crimp fork ...
    • Crush Guard - Installation - Genie ALC500/ALC1000 Crush Guard Frame Installation

      This Tech Doc shows how the Crush Guard frame is Installed on the ALC500/ALC1000 Boom Lift Installation Steps: 1. Position the Crush Guard frame on the man platform. 2. Secure the frame to the vertical posts on each side of the operator controls ...
    • Crush Guard - Installation - Haulotte Star10 Finalisation

      This Tech Doc shows how to finalise and complete the installation Installation Steps: 1. Place the lid back onto the operator control box and tighten the 4 bolts that secure the lid. 2. Connect the M23 connector from the Control Module to the socket ...
    • Crush Guard - Installation - Genie ALC500 Wiring Connections

      This Tech Doc shows Crush Guard wiring connections on the ALC500 Boom Lift Installation Steps: 1. Remove the 4 bolts that secure the lid to the operator control box. 2. Using a flat head screw driver, remove the installed grommet from the operator ...