Crush Guard - Installation - Haulotte HA16PE/HA18PX Finalisation

This Tech Doc shows how to finalise the installation on the Haulotte HA16PE/HA18PX Boom Lift
Installation Steps:
1. Place the lid back onto the
operator control box and tighten
the 4 bolts that secure the lid.
2. Connect the M23 connector from
the Control Module to the socket
installed in the operator control
box.
3. Make sure that the
connector is screwed up finger
tight.
4. Inspect the entire Crush Guard
installation, make sure that all
bolts, connectors and cables are
secure.
5. Make sure that the
machine is fit for operation.
Related Articles
Crush Guard - Installation - Haulotte Star10 Finalisation
This Tech Doc shows how to finalise and complete the installation Installation Steps: 1. Place the lid back onto the operator control box and tighten the 4 bolts that secure the lid. 2. Connect the M23 connector from the Control Module to the socket ...
Crush Guard - Installation - Genie ALC500/ALC1000 Finalisation
This Tech Doc outlines the finalisation stages Finalisation Steps: 1. Place the lid back onto the operator control box and tighten the 4 bolts that secure the lid. 2. Connect the M23 connector from the control module to the socket installed in the ...
Crush Guard - Installation - Manitou 160ATJ/180ATJ/200ATJ Finalisation
This Tech Doc shows the Finalisation steps on the Manitou 160ATJ/180ATJ/200ATJ Boom Lift Finalisation Steps: 1. Connect the M23 connector from the Control Module to the socket installed in the operator control box. 2. Make sure that the connector is ...
Crush Guard - Installation - Haulotte Star10 Crush Guard Frame Installation
This Tech Doc shows how the Crush Guard frame is Installed on the Man Platform Installation Steps: 1. Position the Crush Guard Frame on the man platform. 2. Secure the frame to the horizontal posts on each side of the operator controls using the ...
Crush Guard - Installation - JLG X19J Finalisation
This Tech Doc shows how to Finalise and complete the installation Installation Steps: 1. Replace the lid to the electronic enclosure. 2. Connect the M23 connector from the control module to the socket installed in the operator control box. 3. Make ...