Crush Guard - Installation - Haulotte Star10 Overview

The purpose of the Model6252 Crush Guard is to prevent the operator from being crushed against the man platform controls. This can result in involuntary operation of the machine
The system consists of the following functional components.
Crush
Guard
Frame
The Crush Guard frame is
mounted to the man platform
in front of the operator
controls.
Crush
Guard
Control
Module
The Crush Guard control
module is mounted at the rear
of the operator controls. This
module integrates with the
man platform electronics
Wire
Harness
The wire harness provides
electrical connectors between
the control module and the
man platform electronics.
Shown below is a general overview of how the major components are integrated with the
man platform
Related Articles
Crush Guard - Installation - Genie ALC500/ALC1000 Installation Overview
This Tech Doc shows the Installation Overview on the ALC500/ALC1000 Boom Lift The purpose of the Model6252 Crush Guard, is to prevent the operator from being crushed against the man platform controls, resulting in involuntary operation of the ...
Crush Guard - Installation - Genie Z-40/23N Overview
The purpose of the Model6252 Crush Guard is to prevent the operator from being crushed against the man platform controls. This can result in involuntary operation of the machine The system consists of the following functional components. Crush Guard ...
Crush Guard - Installation - Haulotte Star10 Machine Connections
This Tech Doc shows how the Machine Connections are completed Installation Steps: 1. Remove the 4 bolts that secure the lid to the operator control box. 2. Drill a 20 mm hole in the location marked earlier for the M23 connector. 3. Insert the ...
Crush Guard - Installation - Haulotte Star10 Finalisation
This Tech Doc shows how to finalise and complete the installation Installation Steps: 1. Place the lid back onto the operator control box and tighten the 4 bolts that secure the lid. 2. Connect the M23 connector from the Control Module to the socket ...
Crush Guard - Installation - Haulotte Star10 Control Module Installation
This Tech Doc shows how the Control Module is mounted and installed Installation Steps: 1. Drill four M6 holes into top control box platform to mount the Control module. 2. Attach the Control Module to the platform using the supplied nuts and bolts. ...