Crush Guard - Installation - Haulotte Star10 Overview

Crush Guard - Installation - Haulotte Star10 Overview

Notes
The purpose of the Model6252 Crush Guard is to prevent the operator from being crushed against the man platform controls. This can result in involuntary operation of the machine
The system consists of the following functional components.
Crush Guard Frame
The Crush Guard frame is mounted to the man platform in front of the operator controls. 


Crush Guard Control Module 
The Crush Guard control module is mounted at the rear of the operator controls. This module integrates with the man platform electronics 


Wire Harness 
The wire harness provides electrical connectors between the control module and the man platform electronics. 

Shown below is a general overview of how the major components are integrated with the man platform 

    • Related Articles

    • Crush Guard - Installation - Genie ALC500/ALC1000 Installation Overview

      This Tech Doc shows the Installation Overview on the ALC500/ALC1000 Boom Lift The purpose of the Model6252 Crush Guard, is to prevent the operator from being crushed against the man platform controls, resulting in involuntary operation of the ...
    • Crush Guard - Installation - Genie Z-40/23N Overview

      The purpose of the Model6252 Crush Guard is to prevent the operator from being crushed against the man platform controls. This can result in involuntary operation of the machine The system consists of the following functional components. Crush Guard ...
    • Crush Guard - Installation - Haulotte Star10 Machine Connections

      This Tech Doc shows how the Machine Connections are completed Installation Steps: 1. Remove the 4 bolts that secure the lid to the operator control box. 2. Drill a 20 mm hole in the location marked earlier for the M23 connector. 3. Insert the ...
    • Crush Guard - Installation - Haulotte Star10 Finalisation

      This Tech Doc shows how to finalise and complete the installation Installation Steps: 1. Place the lid back onto the operator control box and tighten the 4 bolts that secure the lid. 2. Connect the M23 connector from the Control Module to the socket ...
    • Crush Guard - Installation - Haulotte Star10 Control Module Installation

      This Tech Doc shows how the Control Module is mounted and installed Installation Steps: 1. Drill four M6 holes into top control box platform to mount the Control module. 2. Attach the Control Module to the platform using the supplied nuts and bolts. ...