Crush Guard - Installation - Manitou 160ATJ/180ATJ/200ATJ Finalisation

This Tech Doc shows the Finalisation steps on the Manitou 160ATJ/180ATJ/200ATJ Boom Lift
Finalisation Steps:
1. Connect the M23 connector from
the Control Module to the socket
installed in the operator control
box.
2. Make sure that the
connector is screwed up finger
tight.
3. Secure the M23 connector cable
to the EWP frame using cable
ties.
4. Inspect the entire Crush Guard
installation
5. Make sure that all
bolts, connectors and cables are
secure.
6. Make sure that the
machine is fit for operation.