This Tech Doc will familiarise you with the components that comprise the Crush Guard in order to perform a service or repair. The diagram below outlines the major system components and how they interconnect:
The purpose of this Tech Doc is to help with the Servicing of the frame structure Frame The frame is mounted to the front of the EWP and runs a steel wire rope in front of the EWP controls. When the operator leans on the wire rope the alarm will ...
The components of the Crush Guard require periodic checks and maintenance to be performed to ensure it remains in good working order. Clean the Magnetic Anchor The magnetic anchor can accumulate metallic debris. If too much debris accumulates around ...
This Tech Doc shows Crush Guard wiring connections on the ALC1000 Boom Lift Required hardware: 1000mm of two core cable minimum 18 gauge AWG 700mm of pink wire, minimum 18 gauge AWG 5 x red crimp joiner 1 x blue crimp joiner 1 x yellow crimp fork ...