Crush Guard - User - Pre Operation Checks
Run through the tests below before operating the machine.
The procedure below tests the cutout and override mechanism of the Crush Guard®:
These tests must be performed in addition to the pre
operation checks listed in the machine operator manual
Related Articles
Gen3 - User - Pre Operation Checks
These tests must be performed in addition to the pre operation checks listed in the machine operator manual Run through the tests below before operating the machine.
OverWatch - User - Pre Operational Checks
The OverWatch™ is an electronic detection system and is an aid to the operator. Before use, make sure that the system is in good working condition. Conduct the following pre-operation checks.
Crush Guard - User - Crush Guard Reset Procedure
When the Crush Guard® alarm is triggered Follow the steps below to reset the system: 1. Ensure the magnet is attached, as shown in picture - highlight circle 1 2. Press the Reset button to disable the alarm and return to normal operation - highlight ...
ITC SWL- User - Pre Operationial Checks
Run through the tests below operating the machine. These tests must be performed in addition to the pre operation checks listed in the machine operator manual
Crush Guard - User - Operating The System
The Crush Guard® is designed to cut off the EWP movement when an object impacts the operator from above or behind - and they fall over the controls. The Crush Guard consists of a mechanical frame that runs a wire rope over the operator controls. In ...