Gen3_ITC - Installation - Caterpillar 962K Cabin Loom Installation

Gen3_ITC - Installation - Caterpillar 962K Cabin Loom Installation

Notes
The cabin loom connects the CCIM to the machine connections and the other modules of the system
Installation Steps:
1. Connect the power/camera and IO harnesses to the CCIM bulk head connectors.


2. Connect the ‘Signal Light’ cable and CPIM cable to either of the M12 connector on the CCIM.


3. Connect the 8 pin ‘CCIM to display’ cable and the 5 pin ‘User Control’ cable to the 8-pin and 5 pin connectors on the back of the display.


4. Install the Override button in the location shown in the images below.
  
Warning
Do not disconnect the camera power connection while the system is operating as this can damage the fuse





    • Related Articles

    • Gen3_ITC - Installation - Volvo L120H & L90 Cabin Loom

      The cabin loom connects the CCIM to the machine connections and the other modules of the system 1. Connect the power/camera and IO harnesses to the CCIM bulk head connectors. 2. Connect the reverse camera and remote camera connectors to the ...
    • Gen3_ITC - Installation - Caterpillar 962K Signal Light Installation

      The signal light warns other workers when the ITC is lifting loads close to it's maximum capacity Installation Steps: 1. Drill and tap four M4 holes to mount the signal light bracket to the left side of the cabin roof (location shown in the photo). ...
    • Gen3_ITC - General - What is a GEN 3 ITC?

      This system has been designed specifically for use with Integrated Tool Carriers (ITC) to cover all relative national and international safety standards. This Tech Doc details system specifications, system functionality, installation requirements, ...
    • Gen3_ITC - Installation - Caterpillar 962K Display Installation

      The display shows the current safety status of the ITC Installation Steps: Position the display bracket at the top left of the Switch Column. Drill two M6 holes to attach the bracket to the Switch Column. Secure the bracket to the switch column using ...
    • Gen3_ITC - Installation - Caterpillar 962K External Cable Completion

      The completion of the external cabling is outlined in this Tech Doc Installation Steps: 1. Locate the CCIM cable then locate the cabin entrance grommet (found at the front end of the cabin). Run the CCIM, cutout and camera cable up through the hole ...