Gen3_ITC - Installation - Caterpillar 962K Display Installation

The display shows the current safety status of the ITC
Installation Steps:
- Position the display bracket at the
top left of the Switch Column.
- Drill two M6 holes to attach the
bracket to the Switch Column.
- Secure the bracket to the switch
column using the supplied large
washers and nuts.
- Attach the display to the bracket and
tighten the grub screw.

Adjust the display bracket for optimal viewing angle once the
display is powered

If the M12 screw lock connectors on the display are over
tightened it will twist the connector pins attaching the
connector to the PCB. This could create a short between the pins or even break the solder joints.
Related Articles
Gen3_ITC - General - What is a GEN 3 ITC?
This system has been designed specifically for use with Integrated Tool Carriers (ITC) to cover all relative national and international safety standards. This Tech Doc details system specifications, system functionality, installation requirements, ...
Gen3_ITC - Installation - Volvo L120H & L90 Display Installation
The display shows the current safety status of the ITC. Installation Steps: Position the display bracket at the top left of the Switch Column. Drill two M6 holes to attach the bracket to the Switch Column. Secure the bracket to the switch column ...
Gen3 - Installation - Generic Display Installation
The display is the main indicator device for the Gen3 LMS system and should be mounted in a location that is visible to the operator at all times (regardless of the steering wheel and/or seat position). Please refer to the specific EQSS Gen 3 ...
Gen3_ITC - Installation - Caterpillar 962K Installation Finalisation
This Tech Doc will complete the final power connections to power the system and finish any additional items Installation Steps: 1. Connect the 3 pin connector from the “24V to 12V converter” to the power/camera harness. And make sure that the 24V to ...
Gen3_ITC - Installation - Caterpillar 962K Cabin Loom Installation
The cabin loom connects the CCIM to the machine connections and the other modules of the system Installation Steps: 1. Connect the power/camera and IO harnesses to the CCIM bulk head connectors. 2. Connect the ‘Signal Light’ cable and CPIM cable to ...