Gen3_ITC - Installation - Volvo L120H & L90 Signal Light Installation

The signal light warns other workers when the ITC is lifting loads close to it's maximum
capacity.
Installation Steps:
1. Drill and tap four M4 holes to mount
the signal light bracket to the left
side of the cabin roof (as shown in
the photo below).
2. Mount using the supplied M4 bolts
and washers.
3. Making sure that the
top signal light is lower than the
machines roof line.
4. Run the cable through the roof and
feed through the cabin entrance
grommet on the right side of
machine.
5. Ensure that the cable is secured
firmly with cable ties.
6. As the signal light cable is run down
the switch pillar inside the cabin; it
will be run at the same time the
override and camera switches are
installed

Ensure the power supply voltage is greater than 13.5V
otherwise the signal light may not illuminate correctly.