ITC SWL- User - Pre Operationial Checks
Run through the tests below operating the machine.
These tests must be performed in addition to the pre
operation checks listed in the machine operator manual
Related Articles
Gen3 - User - Pre Operation Checks
These tests must be performed in addition to the pre operation checks listed in the machine operator manual Run through the tests below before operating the machine.
OverWatch - User - Pre Operational Checks
The OverWatch™ is an electronic detection system and is an aid to the operator. Before use, make sure that the system is in good working condition. Conduct the following pre-operation checks.
Crush Guard - User - Pre Operation Checks
Run through the tests below before operating the machine. The procedure below tests the cutout and override mechanism of the Crush Guard®: These tests must be performed in addition to the pre operation checks listed in the machine operator manual
ITC SWL- User - Cutout Override
The SWL safety system will engage the hydraulic cutout if the ITC is beyond it's recommended capacity. The operator is allowed to temporarily override this cutout to allow the boom to be moved back into a safe working region. In order to engage the ...
ITC SWL- Faults - Maintenance
The components of the SWL safety system require periodic checks and maintenance to be performed to ensure it remains in working order. As the SWL is a safety device it's load calibration must be tested every 12 months or when ever changes have ...