Gen3_ITC - Installation - Volvo L120H & L90 EQSS CCIM Installation

Gen3_ITC - Installation - Volvo L120H & L90 EQSS CCIM Installation

Notes
The CCIM connects the system into the machine electronics
Installation Steps:
1. Mount the backup battery in the location shown in the diagram using the double sided velcro tape attached to the base.


2. Slide the CCIM in the location shown in the diagram 

    • Related Articles

    • Gen3_ITC - Installation - Caterpillar 962K EQSS CCIM Module Installation

      The CCIM connects the system into the machine electronics Installation Steps: 1. Mount the backup battery in the location shown in the diagram using the double sided velcro tape attached to the base. 2. Slide the CCIM in the location shown in the ...
    • Gen3_ITC - Installation - Volvo L120H & L90 Boom Angle Sensor Installation

      The Boom Angle Sensor is used to determine the inclination of the boom relative to the initially calibrated machine angle. Installation Steps: 1. Drill two M6 holes for the Angle Sensor in the position on the arm Shown in the diagram. 2. Mount the ...
    • Gen3_ITC - Installation - Volvo L120H Main Head & Rod Pressure Sensors

      The hydraulic pressure sensors are used to measure the lifting load of the ITC Installation Steps: Completely lower the boom. Apply the handbrake and insert chock under wheels. Once lowered, release any residual pressure by pulling on the manual ...
    • EQSS Installation and Operation Manuals

      The EQSS website has available many installation and operation manuals in pdf form for both Gen-3 and Overwatch products. To locate the manual that relates to your particular Make/Model of machine, simply navigate to the EQSS website - 'Products' ...
    • Gen3_ITC - General - What is a GEN 3 ITC?

      This system has been designed specifically for use with Integrated Tool Carriers (ITC) to cover all relative national and international safety standards. This Tech Doc details system specifications, system functionality, installation requirements, ...