Gen3_ITC - Installation - Caterpillar 962K Signal Light Installation

Gen3_ITC - Installation - Caterpillar 962K Signal Light Installation

Notes
The signal light warns other workers when the ITC is lifting loads close to it's maximum capacity

Installation Steps:
1. Drill and tap four M4 holes to mount the signal light bracket to the left side of the cabin roof (location shown in the photo).


2. Mount using the supplied M4 bolts and washers. Making sure that the top signal light is lower than the machines roof line.


3. Run the cable through the roof and feed through the cabin entrance grommet the same as the other two signal lights.


4. The signal light cable is run down the switch pillar inside the cabin.


Alert
Ensure the power supply voltage is greater than 13.5V otherwise the signal light may not illuminate correctly.