Gen3_ITC - Installation - Caterpillar 962K Signal Light Installation

The signal light warns other workers when the ITC is lifting loads close to it's maximum
capacity
Installation Steps:
1. Drill and tap four M4 holes to mount
the signal light bracket to the left
side of the cabin roof (location shown in
the photo).
2. Mount using the supplied M4 bolts
and washers. Making sure that the
top signal light is lower than the
machines roof line.
3. Run the cable through the roof and
feed through the cabin entrance
grommet the same as the other two
signal lights.
4. The signal light cable is run down
the switch pillar inside the cabin.

Ensure the power supply voltage is greater than 13.5V
otherwise the signal light may not illuminate correctly.