Gen3_ITC - Installation - Set Time & Sensor Calibration

Once the installation is complete, the time will need to be set and the sensors will require
calibration
Follow the steps below to complete sensor calibrations

A sensor calibration must be performed once the cable reeler
and CPIM have been mounted. If the cable reeler or CPIM
have been moved/repositioned a recalibration must be
performed
Related Articles
SFPL - Installation - Sensor Calibration
Once the installation is complete, the sensors will require calibration. Sensors may also require re-calibration with other maintenance tasks (Display, SD card, Cable reeler replacement) Sensor calibration steps below: A sensor calibration must be ...
Gen3_ITC - General - What is a GEN 3 ITC?
This system has been designed specifically for use with Integrated Tool Carriers (ITC) to cover all relative national and international safety standards. This Tech Doc details system specifications, system functionality, installation requirements, ...
ITC SWL- Hitachi - Load Sensor Installation
The load sensor measures the load attached to the hook of the jib and if the load is greater than the set weight it signals an overload back to the cabin electronics. The load sensor is installed between the jib structure and the hook. Remove the ...
OverWatch - User - Session Auto Calibration
The OverWatch starts sensing the operator from the time the platform’s dead-man trigger is pressed. When the machine is powered, and the system is functional, the operator will see a green light on the OverWatch sensor. This indicates that the ...
Gen3_ITC - Installation - Caterpillar 962K Pressure Sensor Installation
The hydraulic pressure sensors are used to measure the lifting load of the ITC Main Cylinder Installation Steps: 1. Raise the boom to approximately 40 degrees. Support and secure the boom using an A Frame or similar apparatus. It must support at ...