Gen3_ITC - Installation - Volvo L120H & L90 External Cable Completion

Gen3_ITC - Installation - Volvo L120H & L90 External Cable Completion

Notes
All external cabling is completed in this section
Installation Steps:

1. Locate the reverse camera cable, CCIM cable and Machine cutout cable and 6-core video cable. Locate the cabin entrance grommet located at the front end of the cabin.


2. Run the CCIM, cutout and camera cable up through the hole into the cabin under the foot pedals.
Note: Pull the entire length of cable through into the cabin, excess cable will be stored beneath the side console.

3. Cable tie all the cables coming from the front of the machine to the rubber hosing to ensure that the cables do not obstruct the pivoting of the machine.


4. Route the cables along the path shown in the diagram to prevent tension on cable during movement of front end during steering.

5. Coil up the additional cabling for the pressure sensor, boom, signal light and height limiter cables and store in the location shown in the diagram.


6. Connect the CCIM cable to the side of the CPIM.


7. Machine Cutout Locate the solenoid PWM9101 ‘Lift arms up solenoid’ which is situated underneath the machine close to the centre of the two front tyres. Note: The boom cannot be lifted until the rest of the installation has been completed.


8. Unplug the existing two-pin connector and replace it with the one end of the T-connector, with the other end of the connector connecting to the existing cable.