Gen3_ITC - Installation - Volvo L120H & L90 Machine Connections

Gen3_ITC - Installation - Volvo L120H & L90 Machine Connections

Notes
This Tech Doc describes how to connect the safety systems to the existing electronics in the machine
Alert
To complete all of the steps within this Tech Doc, you should either be an auto electrician or have the services of an auto electrician.
EQSS accepts no responsibility for ultimate wiring outcomes by unqualified personnel
Installation Steps:
1. Route both the system power for the 24V to 12V converter and the DT6 connection cable from the remote camera switch as shown in the diagram below.


2. Locate the system power lug - 24V (near the right side of ECU). Attach the power wire (yellow) from the 24V to 12V converter to the ring lug.


3. Locate the system ground lug near the right side of ECU. Attach the ground wire (black) from the 24V to 12V converter to the ring lug.


4. Locate the terminal DC2 in main ECU near the top of the board. Cut and Splice the wire attached to the terminal with the ‘24V to 12V converter’ signal wire (Purple).


5. Locate the terminal DB6 in main ECU near the top of the board. Cut and Splice the wire attached to the terminal with the Reverse Camera signal wire (White).


Notes
Some machines had wiring modifications applied by the end user and may not match the wiring in this Tech Doc
Warning
Isolate the main battery before starting the machine connections 
Warning
After completing the machine connections the boom can not be moved until the installation is complete